The Basic Principles Of Termite Control Liquid Or Bait

Little Known Questions About Termite Control Machine.The Ultimate Guide To Termite Control Maintenance

The Best Strategy To Use For Termite Control Liquid Or Bait


With a termite baiting program, there can be no absolute guarantee of long-term protection of nearby buildings. There may be other termite nests nearby the building which do not find the bait stations. Your home is a considerably larger bait station. Other termite nests may exist in trees, under concrete on-ground flooring and in-fill patios of neighboring properties. .

The Sentricon baits are placed in their in-ground bait stations after removal of the termite infested timber therein. This may involve sufficient disruption of these termites such that they avoid the in-ground Sentricon bait station, entirely.

This serious short-coming is overcome by the patented Exterra Termite Stations where the timber is aligned around the cylinder such that the bait can be inserted without such disturbance of these termites present.

RECOMMENDATION: Exterra or Sentricon be used where a complete chemical soil barrier treatment using Termidor or Premise is not practicable or desired, and in which a few thousand termites will likely eat the bait.

What Does Termite Control Machine Mean?


A termite monitoring and baiting program can be integrated with a range of methods including (1) drilling susceptible trees and eradication of any termite nest situated therein, and (2) in conjunction with a follow up chemical soil treatment using Termidor or Premise.

Rapid termite colony development and building infestation is generally connected with a readily available timber food and moisture supply nearby the central nest. In addition, buildings are often constructed in a manner that allow termites to gain undetectable entry in the soil to the structural timbers of this building. Listed below are a few helpful recommendations for the home owner to execute in order to decrease the risk of termite activity inside a building. .

Moisture exclusion from inside the wall cavities, around the base of the building and sub-floor region (if any). Water run-off can be excluded from a sub-floor region by the installation of ag-drains. Make sure there's adequate cross flow ventilation in the sub floor location. In addition, a qualified plumber should be engaged to ensure there is no water leakage from plumbing pipes in the bathroom, the shower recess, kitchen, down pipes, guttering and air conditioning unit leak.

The Only Guide to Termite Control Liquid Or Bait


Please note: high humidity, dampness or moisture accumulating in a wall cavity is of high risk to encouraging large scale termite activity inside the building. .

Removal of any timber in contact with the ground. Timbers should be kept above ground to allow full inspection of subterranean termite activity (coming out of the soil thereunder). Any landscaping using wood chip mulch and railroad sleepers must definitely be removed, as they supply ready food source to help in rapid termite colony development. .

Ensure inspection access is unimpeded, particularly Termite Control Machine in sub-floor areas (suspended flooring ) in order to look for evidence of termite activity. If your property is on a concrete slab on ground flooring, be certain you can inspect the entire external slab edge for evidence of termite mud-shelter tubes. Do NOT allow this area to be covered by pavers, landscaping, planter pots, etc, as termites often gain entry into the walls of a building via this area, particularly through external weep holes and minute (2 mm) openings in the mortar in brick-work. .

The Buzz on Termite Control Machine


Should you find live termites or termite damaged timbers DO NOT disturb the area. DO NOT use spray can or insecticides on the termites. If sufficiently disturbed, the termites will probably move everywhere, and may not be rediscovered until additional evident damage has been done. The termite controller can introduce Intrigue termite dust or Exterra termite bait right to the live termites present in an attempt to eliminate the entire termite colony - as discussed in detail above. .

Consumer Note: the installation of a chemical soil barrier does not negate the need for regular competent inspections - at least 3 to 6 months where the termite risk is elevated.

Termite Control Liquid Or Bait for BeginnersThe Best Guide To Termite Control Machine
We recommend 3 or 6 monthly inspections be performed for the first 2 years following a chemical soil treatment. Monitoring of "stand-alone" baiting systems

BE AWARE the right identification of harmful termite species, inspection of a building for tell-tale signs, analysis of circumstances and implementation of an effective termkite control program requires expert skill and judgement based upon professional training and extensive field-work experience in termite control in a vast array of circumstances.

Our Termite Control Maintenance Ideas


Termites, also known as white ants, are small soft bodied insects about half the size of a match-head. It is estimated that they cause more damage to houses in Australia than from flood, fire and storms combined. The harm is so good that termite damage is not covered by insurance meaning that its a problem you need to keep on top of Termite Pest Control.

Leave a Reply

Your email address will not be published. Required fields are marked *