The Termite Control Machine Statements

Termite Control Liquid Or Bait - The FactsMore About Termite Control Maintenance

The smart Trick of Termite Control Machine That Nobody is Discussing


With a termite baiting program, there can be no absolute guarantee of long-term protection of nearby buildings. There may be other termite nests nearby the building that do not find the bait stations. Your home is a considerably bigger bait station. Other termite nests may exist in trees, under concrete on-ground flooring and in-fill patios of neighboring properties. .

The Sentricon baits are put in their in-ground bait stations after elimination of the termite infested timber therein. This will involve sufficient disruption of the termites such that they avoid the in-ground Sentricon bait station, entirely.

This severe short-coming is overcome by the patented Exterra Termite Stations in which the lumber is aligned around the cylinder such that the lure can be inserted without such disturbance of these termites present.

RECOMMENDATION: Exterra or Sentricon be used where a comprehensive chemical soil barrier treatment using Termidor or Premise is not practicable or desirable, and in which a several thousand termites will likely eat the bait.

Examine This Report on Termite Control Maintenance


A termite monitoring and baiting software can be integrated with a range of methods including (1) drilling vulnerable trees and eradication of any termite nest situated therein, and (2) in conjunction with a follow up chemical soil treatment using Termidor or Premise.

Rapid termite colony development and building infestation is usually associated with a readily available timber food and moisture source nearby the central nest. In addition, buildings are often constructed in a manner that allow termites to gain undetectable entry in the ground to the structural timbers of the building. Listed below are a few helpful recommendations for the house owner to execute in order to reduce the risk of termite activity inside a building. .

Moisture exclusion from inside the wall cavities, around the bottom of this building and sub-floor area (if any). Water run-off can be excluded from a sub-floor region by the installation of ag-drains. Make sure there is sufficient cross flow ventilation in the sub floor area. In addition, a skilled plumber ought to be engaged to ensure there is no water leakage from plumbing pipes in the bathroom, the shower recess, kitchen, down pipes, guttering and air conditioning unit leak.

Get This Report about Termite Control Liquid Or Bait


Please note: high humidity, dampness or moisture accumulating in a wall cavity is of high risk to encouraging large scale termite activity inside the building. .

Removal of any wood in contact with the ground. Timbers should be stored above ground to allow full inspection of subterranean termite activity (coming out of the ground thereunder). Any landscaping using timber chip mulch and railway sleepers should definitely be eliminated, as they supply ready food source to help in rapid termite colony development. .

Ensure inspection access is unimpeded, particularly in sub-floor regions (suspended flooring ) in order to search for evidence of termite activity. If your property is on a concrete slab on ground flooring, make sure that you can inspect the entire external slab edge for evidence of termite mud-shelter tubes. Do NOT allow this region to be coated by pavers, landscaping, planter pots, etcas termites often gain entry into the walls of a building via this locality, especially through external weep holes and minute (2 mm) gaps in the mortar in brick-work. .

The Best Strategy To Use For Termite Control Maintenance


If you find live termites or termite damaged timbers DO NOT disturb the region. DO NOT use spray can or insecticides on the termites. If sufficiently disturbed, the termites will probably move elsewhere, and may not be rediscovered until additional obvious damage has been done. The termite controller can introduce Intrigue termite dust or Exterra termite bait directly to the live termites present in an attempt to eliminate the entire termite colony - as discussed in detail above. .

Consumer Note: the installation of a chemical soil barrier does not negate the need for regular competent inspections - at least 3 to 6 months in which the termite risk is elevated.

The Only Guide for Termite Control MaintenanceFacts About Termite Control Maintenance Uncovered
We recommend 3 or 6 monthly inspections have been carried for the first 2 years after a chemical soil treatment. Monitoring of "stand-alone" baiting systems

BE AWARE the right identification of harmful termite species, inspection of a building for tell-tale signs, analysis of circumstances and implementation of an effective termkite control program requires expert skill and judgement based upon professional training and extensive field-work experience in termite control in a wide variety of circumstances.

How Termite Control Maintenance can Save You Time, Stress, and Money.


Termites, also known as white ants, are visit this site small soft bodied insects about half of the size of a match-head. It is projected that they cause more damage to houses in Australia than from flood, fire and storms combined. The damage is so great that termite damage is not covered by insurance meaning its a problem you need to keep on top of Termite Pest Control.

Leave a Reply

Your email address will not be published. Required fields are marked *